Travelers in Santa Barbara on Highway 144 (Sycamore Canyon Road) will encounter a full closure of the roadway on Tuesday, September 16.
The closure will take place on Sycamore Canyon Road from the Five Points Roundabout at Alameda Padre Serra to Highway 192 (Stanwood Drive).
This closure will be in effect from 9 am to 3 pm.
A detour will be available via Barker Pass Road. Message signs will alert travelers in advance of the closure and provide directions for the detour.
Travelers can expect delays of 10 minutes.
Utility crews, operating under a permit from Caltrans, will replace two electrical poles at 1555 and 1579 Sycamore Canyon Road. Pole installation will be performed using two cranes that span the entire width of the roadway.
Road information and updates can also be found on Caltrans District 5 Social Media platforms: X/Twitter at: @CaltransD5, Facebook at: Caltrans Central Coast (District 5) and Instagram at: Caltrans_D5.
Also Read
- Slope Stabilization Work Continues at Regent’s Slide as Caltrans Targets March 2026 Reopening
- Pavement Repairs/Tree Work In Lompoc Over Next Two Weeks
- Highway 1 South Of Guadalupe Set For One-Way Reversing Traffic Control As Emergency Embankment Repairs Begin
- Public Meeting IN Buellton October 1 for Highway 246 Thumbelina Pedestrian And Bike Gap Closure Project
- Highway 1 Daytime Lane Closure South Of Guadalupe Set To Start Monday, September 22



Comments
0 Comments deleted by Administrator