Full Closure of SR-246 in Lompoc for Resurfacing Project Postponed

1 Comments
Reads 1264

UPDATE

THIS FOUR-DAY PROJECT SCHEDULED TO BEGIN TOMORROW HAS BEEN POSTPONED.  A NEW START DATE WILL BE ANNOUNCED WHEN DETAILS ARE CERTAIN.


Source: Caltrans

A four-day project to resurface State Route 246 from the Separation with Highway 1 (near North 12th Street) to Mission Gate Road will begin on Tuesday, Oct. 6 through Friday, Oct. 9

This grind and pave operation will result in a full closure of State Route 246 at this location each day from 7 am until 3 pm.

Motorists headed west may detour onto Purisima Road to reach Lompoc while motorists wishing to travel east towards Buellton may detour onto Hwy. 1 “H” Street to Purisima Road. 

Electronic message boards will be activated to inform the public about this roadwork.

This roadwork will be performed by the Caltrans Maintenance team from Buellton, CA.

Caltrans reminds motorists to move over and slow down when driving through highway construction zones.

For traffic updates on other state highways in Santa Barbara County, motorists can call Caltrans District 5 Public Affairs at (805) 549-3318 or visit the District 5 website at:  https://dot.ca.gov/caltrans-near-me/district-5  

Login to add Comments

1 Comments

Show Comments
fitz Oct 04, 2020 11:07 AM
Full Closure of SR-246 in Lompoc for Resurfacing Project Postponed

Perfect time to get a bulldozer/dumpster to remove the huge mounds of debris/encampment leftovers that have been out there for months now. What a mess right along the Caltrans roadside. It looks like it is on the County property for Bridgehouse. It actually smells when you drive by there.

Please Login or Register to comment on this.